DAMN BATHROOMright now I have the weekend to completely remodel my bathroom. as in new tub, new toilet, new floor, new sheetrock, new texture on walls, new door frame, new door, new door facing, new light switches, new ceiling I started this morning, tomorrow is day two, I have no idea how they do a WHOLE house in 4 days, course it would be easier without the little people brigade. I have my two (5 and 6) and my girlfriend dropped off her two (1 and 4) for the 4 day weekend so I have lots of HELPERS. they are great, not wretched at all, just keeps me focused on seriously working during nap hours. ;)
DAMN BATHTUB
DAMN PLUMBING
DAMN WALL PAPER
DAMN LINOLEUM
DAMN LIGHT SWITCH PLATES
DAMN POPCORN
DAMN PRIMER
DAMN MUD
DAMN PAINT
DAMN IT
I am horribly dehydrated, I really do not have time or patience for hydrating, I swear, it is SUCH A PITA. that is a serious backside to this, getting all the fluids in each day. it is a day consuming process!
Drink: 10 oz green tea
Breakfast: 1 oz steak
Drink: 10 oz IsoPure Blue Raspberry
Lunch: 1 oz chicken
Drink 5 oz water
Dinner: 1 oz salmon