Thursday, September 07, 2006

Conclusion of Serious Cussing

99% done.

it started out as a weekend project on wednesday of last week, just remove and replace a tub and the linoleum on the floor. now it is day 8 and I am so tired. I did drink 24 oz of fluid yesterday, I wanted to drink more (supposed to have 82 oz), but who had the freaking time?

I got the wallpaper removed and the tub in friday, sheetrock on saturday, and mud on sunday, the tissue paper glued down and primed monday the paint (three colors) in tuesday, yesterday:

I did get the linoleum cut / glued in the bathroom/ the new toilet installed, the new door hung, new trim (including mitering the corners in. spackled around the door where the paint pulled away with the old door. (plumbers on friday didnt run a utility knife down the side before RIPPING the old frame / trim off..... boneheads) and the glaze painted over the sponge paint and all the baseboards and 1/4 rounds nailed in place. painted the cabinet

now I just have to get the baseboards and door painted, and then the hall painted. and a little patchwork on the popcorn on the ceiling. and paint the balusters. oh and get a new water supply line for the toilet, since this one is 3 inches too short!